Important information

As a key supplier to the NHS, PHE and other critical life science sectors during the Covid-19 crisis, LTE is committed to ensuring the uninterrupted supply of its sterilization, decontamination, as well as laboratory thermal equipment including incubators, ovens and drying and solution/blanket warming cabinets.

Our UK production site remains fully operational and can offer some products from stock or on shortened lead times. Our Service Centre is continuing to operate a UK-wide team of engineers to carry out a full range of maintenance, service and testing to UKAS and HTM guidelines on both LTE and non-LTE brands of laboratory autoclaves, porous load sterilizers and washer-disinfectors.

Landmark sterile services department

LTE was recently heavily involved with the development of the new CSSD at Broadgreen Hospital which covers the decontamination needs of multiple sites in and around Liverpool.

Installed in 2019, LTE’s installation includes 4 x 42cu.ft. (1250-litre) porous load sterilisers, along with the first UK installation of Remeda semi and fully automated loading/unloading systems.

This ground-breaking project was covered in the January edition of Clinical Services Journal.
Please read the full article here.

 

Post Tags:

Posted In: News , Featured News

Leave a Reply

Your email address will not be published. Required fields are marked *

For security, use of Google's reCAPTCHA service is required which is subject to the Google Privacy Policy and Terms of Use.

I agree to these terms.

"Landmark Sterile Services Department" Press Release clipping

Keep up to date with LTE ___ Sign up to our newsletter to receive news, product offers and stock updates.

LTE Scientific

LTE Scientific